Compliance Guide

Building Regulations:Plumbing Requirements

Navigate Hampshire building regulations with confidence. Complete guide to plumbing compliance for extensions, conversions, and new installations from qualified professionals.

Key Building Regulations for Plumbing

Part G - Sanitation & Hot Water
Core requirements for all plumbing installations
Essential Compliance

Key Requirements:

  • Adequate supply of wholesome water
  • Suitable drainage for foul water
  • Hot water supply to sinks and baths
  • Protection against contamination
  • Water efficiency measures
  • Accessibility requirements

Applies To:

  • All new bathroom installations
  • Kitchen sink and appliance connections
  • Extension water supply
  • Drainage modifications

Non-Compliance Risk:

Work may need to be removed/redone

Typical Costs:

£150-400 building control fees

Part H - Drainage & Waste
Requirements for drainage systems and waste disposal
Critical Infrastructure

Key Requirements:

  • Adequate drainage of foul water
  • Rainwater drainage systems
  • Ventilation of drainage systems
  • Protection from flooding
  • Access for maintenance
  • Sustainable drainage (SuDS) where required

Applies To:

  • New toilet installations
  • Bathroom and kitchen drainage
  • External drainage connections
  • Soakaway and drainage fields

Non-Compliance Risk:

Environmental health enforcement

Typical Costs:

£200-600 including inspections

Part L - Conservation of Fuel & Power
Energy efficiency requirements for hot water systems
Energy Efficiency

Key Requirements:

  • Insulation of hot water pipes
  • Efficient hot water cylinders
  • Controls for heating systems
  • Commissioning of systems
  • Energy efficiency calculations
  • Renewable energy considerations

Applies To:

  • New boiler installations
  • Hot water cylinder replacement
  • Underfloor heating systems
  • Solar hot water integration

Non-Compliance Risk:

Energy performance certificate issues

Typical Costs:

£100-300 for compliance measures

Part M - Accessibility
Ensuring plumbing is accessible to all users
Accessibility Requirements

Key Requirements:

  • Accessible toilet facilities
  • Suitable heights for fixtures
  • Space for wheelchair access
  • Accessible controls and fittings
  • Level access shower facilities
  • Compliance with accessibility standards

Applies To:

  • Ground floor toilet/shower rooms
  • Accessible bathroom installations
  • Kitchen accessibility improvements
  • Disabled facility grants work

Non-Compliance Risk:

Accessibility enforcement action

Typical Costs:

Variable - often higher specification costs

Common Extension Scenarios

Single-Story Rear Extension
Planning:Usually Permitted Development
Building Control:Required for structural work

Plumbing Considerations:

  • Extending hot/cold water supplies
  • New radiator connections
  • Kitchen waste connections
  • Possible consumer unit upgrades

Typical Costs:

£300-800 for compliance

Timeline:

4-6 weeks including inspections

Two-Story Extension
Planning:Often requires planning permission
Building Control:Definitely required

Plumbing Considerations:

  • New bathroom installations
  • Soil stack extensions/new runs
  • Boosted water pressure systems
  • Separate heating zones

Typical Costs:

£600-1,500 for compliance

Timeline:

8-12 weeks including inspections

Loft Conversion with Ensuite
Planning:Usually Permitted Development
Building Control:Required for structural changes

Plumbing Considerations:

  • Pumped waste systems (Saniflo)
  • Additional hot water capacity
  • Structural penetrations for pipes
  • Ventilation requirements

Typical Costs:

£400-1,000 for systems

Timeline:

6-8 weeks including inspections

Garage/Outbuilding Conversion
Planning:Depends on use and size
Building Control:Required for residential use

Plumbing Considerations:

  • New supply from main building
  • Insulation of external pipes
  • Adequate drainage connections
  • Frost protection measures

Typical Costs:

£500-1,200 for new services

Timeline:

4-8 weeks depending on complexity

Building Control Process

1
Pre-Application Research
Understand requirements before starting
  • Check if planning permission is needed
  • Review building regulations requirements
  • Consult with local authority if unsure
  • Get initial quotes from professionals
  • Understand neighbor notification requirements

Timeline:

1-2 weeks

Cost:

Free (research time only)

2
Submit Building Control Application
Formal application to local authority
  • Complete building control application forms
  • Submit detailed plans and specifications
  • Pay application fees
  • Schedule initial meeting if required
  • Await approval to commence

Timeline:

2-4 weeks

Cost:

£150-600 depending on project size

3
Foundation/Structural Stage
First formal inspection point
  • Notify building control 24-48 hours in advance
  • Ensure all work is ready for inspection
  • Address any issues raised
  • Get approval before proceeding
  • Document any variations from plans

Timeline:

1 day inspection + any remedial work

Cost:

Included in application fee

4
Services Installation Stage
Plumbing and electrical rough-in inspection
  • Complete all pipe runs and electrical rough-in
  • Pressure test plumbing systems
  • Notify building control for inspection
  • Address any non-compliances
  • Get approval before closing up walls

Timeline:

1-2 days including any corrections

Cost:

Included in application fee

5
Final Inspection & Completion
Final sign-off and compliance certificate
  • Complete all finishing work
  • Test all systems and provide certifications
  • Submit completion notice
  • Receive building control completion certificate
  • Update property records

Timeline:

1-2 weeks for final processing

Cost:

Included in application fee

Hampshire Building Control Authorities

Winchester City Council
Winchester, Bishops Waltham, New Alresford
Phone:

01962 840 222

Website:

winchester.gov.uk

Specialty: Historic property expertise, conservation area guidance

Test Valley Borough Council
Andover, Romsey, Stockbridge
Phone:

01264 368 000

Website:

testvalley.gov.uk

Specialty: Rural property specialists, agricultural building experience

Basingstoke & Deane Borough Council
Basingstoke, Tadley, Whitchurch
Phone:

01256 844 844

Website:

basingstoke.gov.uk

Specialty: New development focus, modern standards expertise

East Hampshire District Council
Alton, Petersfield, Bordon
Phone:

01730 266 551

Website:

easthants.gov.uk

Specialty: South Downs National Park considerations

Common Compliance Mistakes to Avoid

Not Notifying Building Control
Very Common

Consequence:

Enforcement action, insurance issues, sale problems

Prevention:

Always check requirements before starting work

Remedy Cost:

£500-2,000 for retrospective approval

Inadequate Drainage Provision
Common

Consequence:

Health hazards, environmental issues, costly remediation

Prevention:

Proper drainage calculations and professional design

Remedy Cost:

£1,000-5,000 for drainage corrections

Poor Water Pressure Planning
Common

Consequence:

Inadequate performance, system failures

Prevention:

Pressure calculations and booster pump consideration

Remedy Cost:

£300-1,200 for pressure solutions

Ignoring Accessibility Requirements
Moderate

Consequence:

Non-compliance, reduced property value

Prevention:

Consider Part M requirements from design stage

Remedy Cost:

£800-3,000 for accessibility improvements

Ensure Your Project Complies

Don't risk costly mistakes or delays. Our qualified team ensures full compliance with Hampshire building regulations from design to completion.