Bathroom Renovation Timeline:What to Expect

Complete week-by-week guide to bathroom renovation timelines. Realistic expectations, costs, and expert tips from professional bathroom fitters serving Hampshire and Wiltshire.

Typical Bathroom Renovation Timeline

6-8 Weeks

Total Duration

£6,000-12,000

Typical Investment

7 Phases

Key Stages

Important: This timeline assumes standard work with no major complications. Complex projects, custom features, or unexpected issues may extend the schedule.

Week-by-Week Renovation Breakdown

Phase 1: Planning & Design
Design consultation, measurements, and material selection
Weeks 1-2

1-2 weeks

Key Tasks

  • Initial consultation and site survey
  • Design proposals and 3D renders
  • Material selection and ordering
  • Building regulations check
  • Final quote approval
  • Schedule confirmation

Who's Involved

You
Designer
Surveyor

Cost Range

£0-500 (design fees if applicable)

Pro Tips

  • Have a clear budget in mind
  • Collect inspiration photos
  • Consider future needs
  • Check warranty periods
Phase 2: Strip-Out & First Fix
Removal of old bathroom and rough plumbing/electrical work
Week 3

2-3 days

Key Tasks

  • Protection of other areas
  • Removal of old suite and tiles
  • Structural assessment
  • New pipe runs and waste routing
  • Electrical rough-in
  • Any structural modifications

Who's Involved

Plumber
Electrician
Plasterer

Cost Range

£800-1,500

Pro Tips

  • Expect dust and noise
  • Arrange temporary bathroom facilities
  • Check for hidden issues
  • Document any changes needed
Phase 3: Plastering & Preparation
Wall preparation, plastering, and drying time
Week 4

2-3 days

Key Tasks

  • Wall repairs and preparation
  • New plasterwork where needed
  • Ceiling repairs
  • Waterproof membrane installation
  • Drying and curing time
  • Surface preparation for tiling

Who's Involved

Plasterer
Waterproofing specialist

Cost Range

£400-800

Pro Tips

  • Allow proper drying time
  • Check ventilation is adequate
  • Plan around drying weather
  • Inspect all surfaces before tiling
Phase 4: Tiling & Flooring
Wall and floor tiling installation
Week 5

3-4 days

Key Tasks

  • Floor preparation and leveling
  • Underfloor heating installation (if specified)
  • Wall tiling installation
  • Floor tiling installation
  • Grouting and sealing
  • Trim and finishing work

Who's Involved

Tiler
Underfloor heating specialist

Cost Range

£1,200-3,000 (depending on tiles chosen)

Pro Tips

  • Inspect tile delivery before installation
  • Allow extra time for complex patterns
  • Check levels and alignment daily
  • Plan grout color carefully
Phase 5: Second Fix Plumbing
Installation of bathroom suite and fittings
Week 6

2-3 days

Key Tasks

  • Toilet installation and connection
  • Basin and vanity unit fitting
  • Bath or shower tray installation
  • Shower screen or enclosure fitting
  • Tap and valve connections
  • Pressure testing and commissioning

Who's Involved

Plumber
Bathroom fitter

Cost Range

£600-1,200

Pro Tips

  • Check all connections for leaks
  • Test water pressure and temperature
  • Ensure proper waste flow
  • Document warranty information
Phase 6: Electrical & Lighting
Final electrical connections and lighting installation
Week 7

1-2 days

Key Tasks

  • Light fitting installation
  • Extractor fan connection
  • Heated towel rail wiring
  • Electrical testing and certification
  • Switch and socket installation
  • Safety inspections

Who's Involved

Qualified electrician

Cost Range

£300-600

Pro Tips

  • Use bathroom-rated fixtures only
  • Test all circuits before use
  • Keep electrical certificates safe
  • Consider timer switches for fans
Phase 7: Finishing & Snagging
Final touches, cleaning, and quality checks
Week 8

1-2 days

Key Tasks

  • Silicone sealing and finishing
  • Mirror and accessory installation
  • Final cleaning and polishing
  • Snagging list completion
  • Handover and demonstration
  • Warranty documentation

Who's Involved

Project manager
Cleaning team

Cost Range

£200-400

Pro Tips

  • Check everything works properly
  • Learn maintenance requirements
  • Keep all warranties safe
  • Take photos for insurance

What Could Cause Delays?

Understanding potential delays helps set realistic expectations and plan accordingly.

Hidden Problems
+3-7 days
Structural issues, rot, or outdated wiring discovered during strip-out

Prevention:

Thorough pre-renovation survey

Custom Orders
+1-4 weeks
Bespoke vanities, special tiles, or made-to-measure items

Prevention:

Order early in planning phase

Building Regulations
+2-5 days
Unexpected requirements or inspection delays

Prevention:

Check requirements early

Weather Delays
+1-3 days
Affects drying times and material deliveries

Prevention:

Plan around weather forecasts

💡 Our Approach to Delays

We build contingency into every project timeline and keep you informed of any changes. Our experience helps anticipate potential issues and minimize disruption to your schedule.

Typical Budget Breakdown

Understanding where your money goes in a typical £6,000-12,000 bathroom renovation:

40%
Labour

£2,400-4,800

35%
Materials

£2,100-4,200

20%
Suite & Fittings

£1,200-2,400

5%
Contingency

£300-600

Budget Planning Tips:

  • Always include a 10-15% contingency for unexpected issues
  • Premium materials can increase costs by 30-50%
  • Get detailed quotes that break down all costs

Ready to Start Your Bathroom Renovation?

Get a detailed timeline and quote for your specific project. We'll walk through every phase so you know exactly what to expect.

Get In Touch

Choose your preferred contact method

Get Free Quote
Contact form & pricing
Online Booking
Schedule your service

Professional Plumbing • Hampshire & Wiltshire

🟢 Office Hours